Greensboro
Outer Loop over Burlington Road
Greensboro, NC Contract Amount: $ 526,380 |
NCDOT/REA
Construction Co.
David Grey 704/553-6500 |
Drilled
shafts for eight new bridges. Hard rock required use of the purpose built hydraulic truck
mounted TBG, built by CCC, and the Delmag drill rigs with proprietary sectional casings,
purpose built air core barrels and down hole hammer. Design: 52 42Æ
- 60Æ
X 12-40 Concrete
volume: approx. 550 cu.yd. |
1998 |
Thomas S. Baker Cement Plant Newberry, FL Contract Amount: $ 273,335 |
Florida Rock Ind./
The Hardaway Co. |
Drilled
shafts for the pre-heater and kiln. Used
proprietary section casing to the rock layer and drilled 30 rock sockets in the
limestone formation. Design:
78 36 X 45; with 30 rock socket . Concrete
volume: approx. 920 cu.yd. |
1998 |
Pearl
River Hwy 25 Bridge
Wiggins,
MS Contract
Amount: $ 941,670 |
MDOT/Hill
Brothers Jimmy
Pierce 601/837-3041 |
Drilled
shafts for new bridge. Hard rock required use of hydraulic powered Delmag drill rig,
vibratory hammer, temporary and permanent casings. Land and water installations. Design:
53 66Æ
X 57 90 and I Osterberg Cell load test. Concrete
volume: approx. 3,900 cu. yd. |
1998 |
I-85
Improvements-Mallard Creek Bridge Charlotte,
NC Contract
Amount: $ 1,742,270 |
NCDOT/REA
Construction David
Grey 704/553-6500 |
Drilled
shafts for new bridge drilled. Hard rock required use of hydraulic powered Delmag drill
rig with proprietary sectional casing, purpose built air core barrels and down-hole
hammer. Design: 113 48Æ
X 25- 60 Concrete
volume: approx. 2,500 cu.yd. |
1997 |
|
|
|
|