References - Use our Experience
Secant Wall
The New Raleigh Convention Center, Raleigh, North Carolina
Client:
Skanska/Barnhill Joint Venture
Owner:
The City of Raleigh
Structural Engineer:
Ross Bryan Associates, Inc.
Geotechnical Engineer:
MACTEC Engineering & Consulting, Inc.
Construction Period:
May 2005 through December 2005
Project Value:
$4,600,000
|
Scope of Work: Coastal Caisson used a Bauer BG-28 Drill Rig with 1500mm O.D. segmental drill casing and tooling. The site soils consisted of wet silty sands overlying the variably weathered Gneiss bed rock. |
![]() |
![]() |



