Driven Ductile Pile
Roosevelt Middle School, West Palm Beach, Florida

Client:
  Pavarini Construction Company
Owner:
  School District of Palm Beach County
Geotechnical Engineer:   Mactec Engineering & Consulting
Construction Period:
  December 2007

 

Scope of Work:

Coastal Caisson installed (319) 4.7” diameter driven Ductile Piles to a depth ranging from 60ft. to 70ft
deep to support an addition to the existing school. The Ductile Piles were rated for 40 tons allowable with a factor of safety of two. Time was of essence as the production piles and load testing had to be
completed over the Christmas holiday period when the school was not in use.

Coastal Caisson completed the works 4 days ahead of schedule and within budget. The Ductile Driven Pile consists of a segmental pipe section driven with a high frequency hammer fitted to track hoe. The high frequency hammer results in virtually no vibration, whilst the segmental construction of the pile provides easy delivery of the pile sections and minimal pile waste.